Prati
Ravi Shankar Kumar
Ravi Shankar Kumar
Assistant Professor, Govt. Engineering College, Aurangabad, Bihar, India
Potvrđena adresa e-pošte na maths.iitkgp.ernet.in
Naslov
Citirano
Citirano
Godina
Multi-objective modeling of production and pollution routing problem with time window: A self-learning particle swarm optimization approach
RS Kumar, K Kondapaneni, V Dixit, A Goswami, LS Thakur, MK Tiwari
Computers & Industrial Engineering 99, 29-40, 2016
1692016
Cooperative sustainable supply chain for deteriorating item and imperfect production under different carbon emission regulations
C Rout, A Paul, RS Kumar, D Chakraborty, A Goswami
Journal of cleaner production 272, 122170, 2020
932020
Two-echelon fuzzy stochastic supply chain for the manufacturer–buyer integrated production–inventory system
RS Kumar, MK Tiwari, A Goswami
Journal of Intelligent Manufacturing 27, 875-888, 2016
542016
Designing multi-period supply chain network considering risk and emission: a multi-objective approach
RS Kumar, A Choudhary, SAKI Babu, SK Kumar, A Goswami, MK Tiwari
Annals of Operations Research 250 (2), 427-461, 2017
452017
EPQ model with learning consideration, imperfect production and partial backlogging in fuzzy random environment
RS Kumar, A Goswami
International Journal of Systems Science 46 (8), 1486-1497, 2015
452015
A continuous review production–inventory system in fuzzy random environment: Minmax distribution free procedure
RS Kumar, A Goswami
Computers & Industrial Engineering 79, 65-75, 2015
432015
A fuzzy random EPQ model for imperfect quality items with possibility and necessity constraints
RS Kumar, A Goswami
Applied Soft Computing 34, 838-850, 2015
392015
Fuzzy EOQ models with ramp type demand rate, partial backlogging and time dependent deterioration rate
RS Kumar, SK De, A Goswami
International Journal of Mathematics in Operational Research 4 (5), 473-502, 2012
392012
An EPQ model for deteriorating items with imperfect production, inspection errors, rework and shortages: a type-2 fuzzy approach
C Rout, RS Kumar, D Chakraborty, A Goswami
Opsearch 56, 657-688, 2019
352019
Integrated optimization of inventory, replenishment and vehicle routing for a sustainable supply chain under carbon emission regulations
C Rout, A Paul, RS Kumar, D Chakraborty, A Goswami
Journal of Cleaner Production 316, 128256, 2021
322021
Trade-credit modeling for deteriorating item inventory system with preservation technology under random planning horizon
DJ Mohanty, RS Kumar, A Goswami
Sadhana 43 (3), 45, 2018
242018
A bi-objective two-echelon pollution routing problem with simultaneous pickup and delivery under multiple time windows constraint
A Paul, RS Kumar, C Rout, A Goswami
Opsearch, 1-32, 2021
152021
Fuzzy stochastic EOQ inventory model for items with imperfect quality and shortages are backlogged
RS Kumar, A Goswami
Advanced Modeling and Optimization 15 (2), 261-279, 2013
142013
Modeling a type-2 fuzzy inventory system considering items with imperfect quality and shortage backlogging
RS Kumar
Sadhana 43 (10), 163, 2018
122018
A two-warehouse inventory model for non-instantaneous deteriorating items over stochastic planning horizon
DJ Mohanty, RS Kumar, A Goswami
Journal of Industrial and Production Engineering , 1-17, 2016
122016
An improved inventory model with random review period and temporary price discount for deteriorating items
DJ Mohanty, RS Kumar, A Goswami
International Journal of System Assurance Engineering and Management 7 (1 …, 2016
122016
Vendor-buyer integrated production-inventory system for imperfect quality item under trade credit finance and variable setup cost
DJ Mohanty, RS Kumar, A Goswami
RAIRO - Operations Research, 2018
92018
Designing a multi-depot multi-period vehicle routing problem with time window: hybridization of tabu search and variable neighbourhood search algorithm
A Paul, RS Kumar, C Rout, A Goswami
Sādhanā 46 (3), 183, 2021
82021
Continuous review inventory system for intuitionistic fuzzy random demand under service level constraint
M Kumar, RS Kumar, AK Saha
Sadhana 47 (2), 103, 2022
72022
Designing a single-vendor and multiple-buyers’ integrated production inventory model for interval type-2 fuzzy demand and fuzzy rule based deterioration
C Rout, RS Kumar, A Paul, D Chakraborty, A Goswami
Rairo - Operations Research, 2021
42021
Sustav trenutno ne može provesti ovu radnju. Pokušajte ponovo kasnije.
Članci 1–20