CyberFactory# 1—Securing the industry 4.0 with cyber-ranges and digital twins A Becue, Y Fourastier, I Praça, A Savarit, C Baron, B Gradussofs, ... 2018 14th IEEE International Workshop on Factory Communication Systems (WFCS …, 2018 | 86 | 2018 |
A prescriptive approach to qualify and quantify customer value for value-based requirements engineering X Zhang, G Auriol, H Eres, C Baron International Journal of Computer Integrated Manufacturing 26 (4), 327-345, 2013 | 48 | 2013 |
Optimising product development in industry by alignment of the ISO/IEC 15288 systems engineering standard and the PMBoK guide R Xue, C Baron, P Esteban International Journal of Product Development 22 (1), 65-80, 2017 | 40 | 2017 |
Integration of UML in human factors analysis for safety of a medical robot for tele-echography J Guiochet, B Tondu, C Baron Proceedings 2003 IEEE/RSJ International Conference on Intelligent Robots and …, 2003 | 35 | 2003 |
Embedded system applications C Baron, JC Geffroy, G Motet Kluwer Academic Publishers, 1997 | 32 | 1997 |
Using leading indicators to improve project performance measurement L Zheng, C Baron, P Esteban, R Xue, Q Zhang, S Yang Journal of Systems Science and Systems Engineering 28, 529-554, 2019 | 30 | 2019 |
Towards a continuous certification of safety-critical avionics software C Baron, V Louis Computers in Industry 125, 103382, 2021 | 28 | 2021 |
How to find non-functional requirements in system developments KIG Sotelo, C Baron, P Esteban, CYAG Estrada, LJL Velázquez IFAC-PapersOnLine 51 (11), 1573-1578, 2018 | 25 | 2018 |
About adopting a systemic approach to design connected embedded systems: A MOOC promoting systems thinking and systems engineering C Baron, B Daniel‐Allegro Systems Engineering 23 (3), 261-280, 2020 | 22 | 2020 |
Toward a human-centered uml for risk analysis: Application to a medical robot J Guiochet, G Motet, C Baron, G Boy Human Error, Safety and Systems Development: IFIP 18th World Computer …, 2004 | 22 | 2004 |
Quality quantification in systems engineering from the qualimetry eye Y Argotti, C Baron, P Esteban 2019 IEEE International Systems Conference (SysCon), 1-8, 2019 | 21 | 2019 |
Teaching requirements skills within the context of a physical engineering project G Auriol, C Baron, JY Fourniols 2008 Requirements Engineering Education and Training, 6-11, 2008 | 21 | 2008 |
An implicit opinion analysis model based on feature-based implicit opinion patterns Z Fang, Q Zhang, X Tang, A Wang, C Baron Artificial Intelligence Review 53, 4547-4574, 2020 | 20 | 2020 |
Modelling the mutual dependencies between product architectures and a network of partners M Zolghadri, C Baron, P Girard International Journal of Product Development 10 (1-3), 62-86, 2010 | 20 | 2010 |
A new method for measuring process flexibility of product design Q Zhang, D Wu, C Fu, C Baron, Z Peng International Transactions in Operational Research 24 (4), 821-838, 2017 | 19 | 2017 |
Managing systems engineering processes: a multi-standard approach R Xue, C Baron, P Esteban, H Demmou 2014 IEEE International Systems Conference Proceedings, 103-107, 2014 | 19 | 2014 |
Hybridation of Bayesian networks and evolutionary algorithms for multi-objective optimization in an integrated product design and project management context P Pitiot, T Coudert, L Geneste, C Baron Engineering Applications of Artificial Intelligence 23 (5), 830-843, 2010 | 18 | 2010 |
Innovative product and network of partners co-design: Context, problems, and some exploratory results M Zolghadri, C Baron, P Girard Concurrent Engineering 16 (1), 9-21, 2008 | 18 | 2008 |
UML based FMECA in risk analysis J Guiochet, C Baron ESMc'2003, University of Naples II, Naples, Italy, 2003 | 17 | 2003 |
Analysis and comparison of project management standards and guides R Xue, C Baron, P Esteban, L Zheng Proceedings of the International Conference on Mechanics, Materials …, 2015 | 14 | 2015 |