Prati
Kerem Akartunali
Naslov
Citirano
Citirano
Godina
A heuristic approach for big bucket multi-level production planning problems
K Akartunalı, AJ Miller
European Journal of Operational Research 193 (2), 396-411, 2009
1742009
A relax-and-fix with fix-and-optimize heuristic applied to multi-level lot-sizing problems
CFM Toledo, M da Silva Arantes, MYB Hossomi, PM França, K Akartunalı
Journal of Heuristics 21 (5), 687-717, 2015
1032015
An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging
T Wu, L Shi, J Geunes, K Akartunalı
European Journal of Operational Research 214 (2), 428-441, 2011
1002011
A hybrid Integer Programming and Variable Neighbourhood Search algorithm to solve Nurse Rostering Problems
E Rahimian, K Akartunalı, J Levine
European Journal of Operational Research 258 (2), 411-423, 2017
942017
Passenger demand forecasting in scheduled transportation
N Banerjee, A Morton, K Akartunalı
European Journal of Operational Research 286 (3), 797-810, 2020
872020
A hybrid integer and constraint programming approach to solve nurse rostering problems
E Rahimian, K Akartunalı, J Levine
Computers & Operations Research 82, 83-94, 2017
622017
Exploring the impact of innovative developments to the installation process for an offshore wind farm
E Barlow, DT Öztürk, M Revie, E Boulougouris, AH Day, K Akartunalı
Ocean Engineering 109, 623-634, 2015
492015
A mixed-method optimisation and simulation framework for supporting logistical decisions during offshore wind farm installations
E Barlow, DT Öztürk, M Revie, K Akartunalı, AH Day, E Boulougouris
European Journal of Operational Research 264 (3), 894-906, 2018
472018
Computational analysis of lower bounds for big bucket production planning problems
K Akartunalı, AJ Miller
Technical Repor t http://www. optimization-online. org/DB_HTML/2007/05/1668 …, 2007
34*2007
Mixed integer programming in production planning with backlogging and setup carryover: modeling and algorithms
T Wu, K Akartunalı, J Song, L Shi
Discrete Event Dynamic Systems 23 (2), 211-239, 2013
332013
Local Cuts and Two-Period Convex Hull Closures for Big-Bucket Lot-Sizing Problems
K Akartunalı, I Fragkos, AJ Miller, T Wu
INFORMS Journal on Computing 28 (4), 766-780, 2016
322016
A computational analysis of lower bounds for big bucket production planning problems
K Akartunalı, AJ Miller
Computational Optimization and Applications 53 (3), 729-753, 2012
292012
Robust formulations for economic lot-sizing problem with remanufacturing
ÖN Attila, A Agra, K Akartunalı, A Arulselvan
European Journal of Operational Research 288 (2), 496-510, 2021
262021
Progressive selection method for the coupled lot-sizing and cutting-stock problem
T Wu, K Akartunalı, R Jans, Z Liang
INFORMS Journal on Computing 29 (3), 523-543, 2017
252017
MIP approaches for a lot sizing and scheduling problem on multiple production lines with scarce resources, temporary workstations, and perishable products
WAO Soler, MO Santos, K Akartunalı
Journal of the Operational Research Society 72 (8), 1691-1706, 2021
232021
Efficient methods for the distance-based critical node detection problem in complex networks
GU Alozie, A Arulselvan, K Akartunalı, EL Pasiliao Jr
Computers & Operations Research 131, 105254, 2021
232021
A theoretical and computational analysis of lot-sizing in remanufacturing with separate setups
SAS Ali, M Doostmohammadi, K Akartunalı, R van der Meer
International Journal of Production Economics 203, 276-285, 2018
222018
A unified mixed-integer programming model for simultaneous fluence weight and aperture optimization in VMAT, Tomotherapy, and Cyberknife
K Akartunalı, V Mak-Hau, T Tran
Computers & Operations Research 56, 134-150, 2015
222015
An assessment of vessel characteristics for the installation of offshore wind farms
E Barlow, D Tezcaner Ozturk, S Day, E Boulougouris, M Revie, ...
ICMT 2014, 2014
192014
A multistage optimisation algorithm for the large vehicle routing problem with time windows and synchronised visits
M Polnik, A Riccardi, K Akartunalı
Journal of the Operational Research Society 72 (11), 2396-2411, 2021
182021
Sustav trenutno ne može provesti ovu radnju. Pokušajte ponovo kasnije.
Članci 1–20