Follow
Mehdi Yazdani
Mehdi Yazdani
Department of Industrial Engineering, Qazvin Islamic Azad University
Verified email at qiau.ac.ir
Title
Cited by
Cited by
Year
An artificial immune algorithm for the flexible job-shop scheduling problem
A Bagheri, M Zandieh, I Mahdavi, M Yazdani
Future Generation Computer Systems 26 (4), 533-541, 2010
3452010
Flexible job-shop scheduling with parallel variable neighborhood search algorithm
M Yazdani, M Amiri, M Zandieh
Expert Systems with Applications 37 (1), 678-687, 2010
3352010
Hybrid flexible flowshop problems: Models and solution methods
B Naderi, S Gohari, M Yazdani
Applied mathematical modelling 38 (24), 5767-5780, 2014
1112014
A variable neighbourhood search algorithm for the flexible job-shop scheduling problem
M Amiri, M Zandieh, M Yazdani, A Bagheri
International journal of production research 48 (19), 5671-5689, 2010
1082010
Developing two multi-objective evolutionary algorithms for the multi-objective flexible job shop scheduling problem
SHA Rahmati, M Zandieh, M Yazdani
The International Journal of Advanced Manufacturing Technology 64, 915-932, 2013
952013
Solving a fuzzy fixed charge solid transportation problem by metaheuristics
S Molla-Alizadeh-Zavardehi, SS Nezhad, R Tavakkoli-Moghaddam, ...
Mathematical and computer modelling 57 (5-6), 1543-1558, 2013
692013
Two meta-heuristic algorithms for the dual-resource constrained flexible job-shop scheduling problem
M Yazdani, M Zandieh, R Tavakkoli-Moghaddam, F Jolai
Scientia Iranica. Transaction E, Industrial Engineering 22 (3), 1242, 2015
582015
A three level joint location-inventory problem with correlated demand, shortages and periodic review system: Robust meta-heuristics
B Vahdani, M Soltani, M Yazdani, SM Mousavi
Computers & Industrial Engineering 109, 113-129, 2017
572017
A model and imperialist competitive algorithm for hybrid flow shops with sublots and setup times
B Naderi, M Yazdani
Journal of Manufacturing Systems 33 (4), 647-653, 2014
542014
Evaluating project managers by an interval decision-making method based on a new project manager competency model
H Sadeghi, M Mousakhani, M Yazdani, M Delavari
Arabian Journal for Science and Engineering 39, 1417-1430, 2014
502014
Nadir compromise programming: A model for optimization of multi-objective portfolio problem
M Amiri, M Ekhtiari, M Yazdani
Expert Systems with Applications 38 (6), 7222-7226, 2011
492011
A vibration damping optimization algorithm for a parallel machines scheduling problem with sequence-independent family setup times
E Mehdizadeh, R Tavakkoli-Moghaddam, M Yazdani
Applied Mathematical Modelling 39 (22), 6845-6859, 2015
472015
A simulated annealing algorithm for flexible job-shop scheduling problem
M Yazdani, M Gholami, M Zandieh, M Mousakhani
Journal of applied sciences 9 (4), 662-670, 2009
422009
Evolutionary algorithms for multi-objective dual-resource constrained flexible job-shop scheduling problem
M Yazdani, M Zandieh, R Tavakkoli-Moghaddam
OPSEARCH 56 (3), 983-1006, 2019
382019
A simulated annealing/local search to minimize the makespan and total tardiness on a hybrid flowshop
SM Mousavi, M Zandieh, M Yazdani
The International Journal of Advanced Manufacturing Technology 64, 369-388, 2013
362013
Multi-factory parallel machine problems: Improved mathematical models and artificial bee colony algorithm
M Yazdani, S Gohari, B Naderi
Computers & Industrial Engineering 81, 36-45, 2015
322015
Designing a resilient and reliable biomass-to-biofuel supply chain under risk pooling and congestion effects and fleet management
H Soleimanian Khezerlou, B Vahdani, M Yazdani
Journal of Cleaner Production 281 (C), 125101, 2021
222021
A model and metaheuristic for truck scheduling in multi-door cross-dock problems
M Yazdani, B Naderi, M Mousakhani
Intelligent Automation & Soft Computing 21 (4), 633-644, 2015
212015
ALGORITHMS FOR UNIVERSITY COURSE SCHEDULING PROBLEMS.
M Yazdani, B Naderi, E Zeinali
Tehnicki vjesnik/Technical Gazette 24, 2017
202017
An electromagnetism-like metaheuristic for open-shop problems with no buffer
B Naderi, E Najafi, M Yazdani
Journal of Industrial Engineering International 8, 1-8, 2012
202012
The system can't perform the operation now. Try again later.
Articles 1–20