Bi-level game approaches for coordination of generation and transmission expansion planning within a market environment M Jenabi, SMTF Ghomi, Y Smeers IEEE Transactions on Power systems 28 (3), 2639-2650, 2013 | 220 | 2013 |
A hybrid genetic heuristic for scheduling parallel batch processing machines with arbitrary job sizes AH Kashan, B Karimi, M Jenabi Computers & Operations Research 35 (4), 1084-1098, 2008 | 200 | 2008 |
Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines M Jenabi, SMTF Ghomi, SA Torabi, B Karimi Applied Mathematics and Computation 186 (1), 230-245, 2007 | 68 | 2007 |
Acceleration strategies of Benders decomposition for the security constraints power system expansion planning M Jenabi, SMT Fatemi Ghomi, SA Torabi, SH Hosseinian Annals of Operations Research 235, 337-369, 2015 | 32 | 2015 |
Multiple cycle economic lot and delivery-scheduling problem in a two-echelon supply chain SA Torabi, M Jenabi The International Journal of Advanced Manufacturing Technology 43, 785-798, 2009 | 21 | 2009 |
A new solution approach for grouping problems based on evolution strategies AH Kashan, M Jenabi, MH Kashan 2009 International Conference of Soft Computing and Pattern Recognition, 88-93, 2009 | 15 | 2009 |
A Benders decomposition algorithm for a multi-area, multi-stage integrated resource planning in power systems M Jenabi, SMT Fatemi Ghomi, SA Torabi, SH Hosseinian Journal of the Operational Research Society 64 (8), 1118-1136, 2013 | 14 | 2013 |
A Flow shop Production Planning Problem with basic period policy and Sequence Dependent set up times M Aliabadi, F Jolai, E Mehdizadeh, M Jenabi Journal of Industrial and Systems Engineering 5 (1), 1-19, 2011 | 9 | 2011 |
A bi-objective case of no-wait flowshops M Jenabi, B Naderi, SMTF Ghomi 2010 IEEE Fifth International Conference on Bio-Inspired Computing: Theories …, 2010 | 7 | 2010 |
An accelerated Benders decomposition algorithm for stochastic power system expansion planning using sample average approximation M Jenabi, SMT Fatemi Ghomi, SA Torabi, M Sammak Jalali Opsearch, 1-33, 2022 | 6 | 2022 |
A hybrid GA for a supply chain production planning problem M Jenabi, SA Torabi, SA Mansouri Proceedings of the 9th annual conference on Genetic and evolutionary …, 2007 | 5 | 2007 |
Finite horizon economic lot and delivery scheduling problem: Flexible flow lines with unrelated parallel machines and sequence dependent setups M Jenabi, GSMT FATEMI, SA Torabi INTERNATIONAL JOURNAL OF ENGINEERING 21 (2), 141-156, 2008 | 4 | 2008 |
A meta-heuristic approach for the ELDSP in flexible flow lines: the power-of-two policy SA Torabi, M Jenabi Advances in Industrial Engineering 43 (1), 1-13, 2009 | 3 | 2009 |
Hybrid Genetic Algorithms for the Lot Production and Delivery Scheduling Problem in a Two-Echelon Supply Chain SA Torabi, M Jenabi, SA Mansouri Advances in Computational Intelligence in Transport, Logistics, and Supply …, 2008 | 3 | 2008 |
A basic period approach for solving the economic lot and delivery scheduling in flexible flow lines SALI TORABI, M Jenabi INTERNATIONAL JOURNAL OF ENGINEERING 21 (4), 361-374, 2008 | 3 | 2008 |
An electromagnetism-like metaheuristic for sequence dependent open shop scheduling B Naderi, M Jenabi, SMTF Ghomi, D Talebi 2010 IEEE Fifth International Conference on Bio-Inspired Computing: Theories …, 2010 | 1 | 2010 |
Finite Horizon ELSP in Flexible Flow Lines with Unrelated Parallel Machines SA Torabi, M Jenabi, SMTF Ghomi, F Jolai, R Tavakkoli-Moghaddam IFAC Proceedings Volumes 39 (3), 139-144, 2006 | 1 | 2006 |
An Integrated Bi-Objective Reverse Logistics Network Design for Remanufacturing AZ Shojai, J Shahrabi, M Jenabi Exploring Innovative and Successful Applications of Soft Computing, 281-316, 2014 | | 2014 |
A Lagrangean Relaxation-genetic algorithm heuristic for multi-product multi-stage and multi-period lot sizing problem with limited resource capacity H Khadmi Zare, SMT Fatemi Ghomi, B Karimi, M Jenabi, A Raad Advances in Industrial Engineering 44 (1), 2010 | | 2010 |