Pesquisa operacional MN Arenales, VA Armentano, R Morabito Neto, HH Yanasse | 759 | 2007 |
Genetic local search for multi-objective flowshop scheduling problems JEC Arroyo, VA Armentano European journal of operational research 167 (3), 717-738, 2005 | 237 | 2005 |
Tabu search with path relinking for an integrated production–distribution problem VA Armentano, AL Shiguemoto, A Løkketangen Computers & Operations Research 38 (8), 1199-1209, 2011 | 221 | 2011 |
Tabu search for total tardiness minimization in flowshop scheduling problems VA Armentano, DP Ronconi Computers & operations research 26 (3), 219-235, 1999 | 180 | 1999 |
Tardiness minimization in a flexible job shop: A tabu search approach CR Scrich, VA Armentano, M Laguna Journal of intelligent manufacturing 15, 103-115, 2004 | 146 | 2004 |
Scatter search for project scheduling with resource availability cost DS Yamashita, VA Armentano, M Laguna European journal of operational research 169 (2), 623-637, 2006 | 136 | 2006 |
A Lagrangian-based heuristic for the capacitated lot-sizing problem in parallel machines FMB Toledo, VA Armentano European Journal of Operational Research 175 (2), 1070-1083, 2006 | 127 | 2006 |
Adaptive granular local search heuristic for a dynamic vehicle routing problem RM Branchini, VA Armentano, A Løkketangen Computers & Operations Research 36 (11), 2955-2968, 2009 | 126 | 2009 |
Tabu search for minimizing total tardiness in a job shop VA Armentano, CR Scrich International journal of production economics 63 (2), 131-140, 2000 | 121 | 2000 |
Robust optimization models for project scheduling with resource availability cost DS Yamashita, VA Armentano, M Laguna Journal of scheduling 10, 67-76, 2007 | 119 | 2007 |
Lower bounding schemes for flowshops with blocking in-process DP Ronconi, VA Armentano Journal of the Operational Research Society 52 (11), 1289-1297, 2001 | 116 | 2001 |
The Pencil and Controllability–Observability for Generalized Linear Systems: a Geometric Approach VA Armentano SIAM journal on control and optimization 24 (4), 616-638, 1986 | 104 | 1986 |
A heuristic for single machine scheduling with early and tardy costs R Mazzini, VA Armentano European Journal of Operational Research 128 (1), 129-146, 2001 | 94 | 2001 |
A heuristic method for lot-sizing in multi-stage systems PM França, VA Armentano, RE Berretta, AR Clark Computers & operations research 24 (9), 861-874, 1997 | 92 | 1997 |
Eigenvalue placement for generalized linear systems VA Armentano Systems & control letters 4 (4), 199-202, 1984 | 88 | 1984 |
An application of a multi-objective tabu search algorithm to a bicriteria flowshop problem VA Armentano, JE Claudio Journal of Heuristics 10, 463-481, 2004 | 82 | 2004 |
Tabu search for scheduling on identical parallel machines to minimize mean tardiness VA Armentano, DS Yamashita Journal of intelligent manufacturing 11, 453-460, 2000 | 82 | 2000 |
Minimizing total tardiness in parallel machine scheduling with setup times: An adaptive memory-based GRASP approach VA Armentano, MF de Franca Filho European Journal of Operational Research 183 (1), 100-114, 2007 | 79 | 2007 |
A genetic algorithm for scheduling on a single machine with set-up times and due dates VA Armentano, R Mazzini Production Planning & Control 11 (7), 713-720, 2000 | 75 | 2000 |
A heuristic for a resource-capacitated multi-stage lot-sizing problem with lead times AR Clark, VA Armentano Journal of the Operational research Society, 1208-1222, 1995 | 73 | 1995 |