Project cash flow analysis in the presence of uncertainty in activity duration and cost A Maravas, JP Pantouvakis International Journal of Project Management, 2011 | 161 | 2011 |
Early Cost Estimating of Road Tunnel Construction Using Neural Networks K Petroutsatou, E Georgopoulos, S Lambropoulos, JP Pantouvakis Journal of Construction Engineering and Management 138 (6), 679-687, 2012 | 154 | 2012 |
The story of managing projects an interdisciplinary approach edited by Elias G. Carayannis, Young Hoon Kwak, Frank T. Anbari EG Carayannis, YH Kwak, FT Anbari Praeger, 2005 | 127 | 2005 |
Evaluating Research Methodology in Construction Productivity Studies A Panas, JP Pantouvakis The Built & Human Environment Review 3 (1), 2011 | 112 | 2011 |
Geographic information systems for disaster response: A review B Tomaszewski, M Judex, J Szarzynski, C Radestock, L Wirkus Journal of Homeland Security and Emergency Management 12 (3), 571-602, 2015 | 84 | 2015 |
A review of resource-constrained project scheduling problems (RCPSP) approaches and solutions M Abdolshah International Transaction Journal of Engineering, Management, & Applied …, 2014 | 71 | 2014 |
Fuzzy repetitive scheduling method for projects with repeating activities A Maravas, JP Pantouvakis Journal of Construction Engineering and Management 137 (7), 561-564, 2011 | 57 | 2011 |
Financial evaluation program for construction projects at the pre-investment phase in developing countries: A case study WS Halawa, AMK Abdelalim, I Abd Elrashed International Journal of Project Management 31 (6), 912-923, 2013 | 55 | 2013 |
Improving qualifications‐based selection by use of the fuzzy Delphi method OG Manoliadis, JP Pantouvakis, SE Christodoulou Construction Management and Economics 27 (4), 373-384, 2009 | 55 | 2009 |
Road tunnel early cost estimates using multiple regression analysis C Petroutsatou, S Lambropoulos, JP Pantouvakis Operational Research 6 (3), 311-322, 2006 | 46 | 2006 |
An effective disaster recovery model for construction projects LG Anthopoulosa, E Kostavarab, JP Pantouvakisc | 38 | 2012 |
A cost estimate method for bridge superstructures using regression analysis and bootstrap N Fragkakis, S Lambropoulos, JP Pantouvakis Organization, technology & management in construction: an international …, 2010 | 33 | 2010 |
On the use of learning curves for the estimation of construction productivity A Panas, JP Pantouvakis International Journal of Construction Management 18 (4), 301-309, 2018 | 29 | 2018 |
A New Approach to Studying Net Present Value and the Internal Rate of Return of Engineering Projects under Uncertainty with Three‐Dimensional Graphs A Maravas, JP Pantouvakis Advances in Civil Engineering 2018 (1), 6108680, 2018 | 29 | 2018 |
Computer simulation and analysis framework for floating caisson construction operations JP Pantouvakis, A Panas Automation in Construction 36, 196-207, 2013 | 27 | 2013 |
Road tunnels construction cost estimation: a structural equation model development and comparison K Petroutsatou, S Lambropoulos Operational Research 10, 163-173, 2010 | 27 | 2010 |
Simulation-Based and Statistical Analysis of the Learning Effect in Floating Caisson Construction Operations A Panas, JP Pantouvakis Journal of Construction Engineering and Management 140 (1), 2014 | 26 | 2014 |
SEMANTIC: smart EarthMoving analysis and estimation of cost S Lambropoulos, N Manolopoulos, JP Pantouvakis Construction Management & Economics 14 (2), 79-92, 1996 | 25 | 1996 |
A simulation environment for construction project manager competence development in construction management A Panas, JP Pantouvakis, S Lambropoulos Procedia-Social and Behavioral Sciences 119, 739-747, 2014 | 23 | 2014 |
Modeling Uncertainty During Cost Benefit Analysis of Transportation Projects with the Aid of Fuzzy Set Theory A Maravas, JP Pantouvakis, S Lambropoulos Procedia-Social and Behavioral Sciences 48, 3661-3670, 2012 | 23 | 2012 |