Follow
Corentin Le Hesran
Corentin Le Hesran
Doctor, INSA Lyon, DISP Laboratory
Verified email at insa-lyon.fr
Title
Cited by
Cited by
Year
Operations scheduling for waste minimization: A review
C Le Hesran, AL Ladier, V Botta-Genoulaz, V Laforest
Journal of Cleaner Production 206, 211-226, 2019
392019
A methodology for the identification of waste-minimizing scheduling problems
C Le Hesran, AL Ladier, V Botta-Genoulaz, V Laforest
Journal of Cleaner Production 246, 119023, 2020
142020
Reducing waste in manufacturing operations: bi-objective scheduling on a single-machine with coupled-tasks
C Le Hesran, A Agarwal, AL Ladier, V Botta-Genoulaz, V Laforest
International Journal of Production Research 58 (23), 7130-7148, 2020
82020
Reducing waste in manufacturing operations: a mixed integer linear program for bi-objective scheduling on a single-machine with coupled-tasks
C Le Hesran, AL Ladier, V Botta-Genoulaz, V Laforest
IFAC-PapersOnLine 51 (11), 1695-1700, 2018
72018
Using flow assessment to identify a scheduling problem with waste reduction concerns: a case study
C Le Hesran, AL Ladier, V Laforest, V Botta-Genoulaz
6th International EurOMA Sustainable Operations and Supply Chains Forum, 2019
22019
Integrating waste minimization concerns in operations scheduling
C Le Hesran
Université de Lyon, 2019
12019
Multi-objective Genetic Algorithm to Reduce Setup Waste in a Single Machine with Coupled-Tasks Scheduling Problem
C Le Hesran, AL Ladier, V Botta-Genoulaz
IFIP International Conference on Advances in Production Management Systems …, 2021
2021
Integrating waste minimization concerns in operations scheduling| Theses. fr
C Le Hesran
Lyon, 2019
2019
Réduire les déchets de production: ordonnancement bi-objectif sur une machine unique avec réentrance
C Le Hesran, V Botta-Genoulaz, V Laforest, AL Ladier
24ème journées Sciences et Techniques de la Production du GdR MACS (STP 2017), 2017
2017
The system can't perform the operation now. Try again later.
Articles 1–9