Follow
Simon Emde
Title
Cited by
Cited by
Year
Part logistics in the automotive industry: Decision problems, literature review and research agenda
N Boysen, S Emde, M Hoeck, M Kauderer
European Journal of Operational Research 242 (1), 107-120, 2015
3102015
Parts-to-picker based order processing in a rack-moving mobile robots environment
N Boysen, D Briskorn, S Emde
European Journal of Operational Research 262 (2), 550-562, 2017
2122017
Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines
S Emde, N Boysen
European Journal of Operational Research 217 (2), 287-299, 2012
1952012
Just-in-Time supermarkets for part supply in the automobile industry
D Battini, N Boysen, S Emde
Journal of Management Control 24, 209-217, 2013
1662013
Optimally locating in-house logistics areas to facilitate JIT-supply of mixed-model assembly lines
S Emde, N Boysen
International Journal of Production Economics 135 (1), 393-402, 2012
1512012
Optimally loading tow trains for just-in-time supply of mixed-model assembly lines
S Emde, M Fliedner, N Boysen
Iie Transactions 44 (2), 121-135, 2012
1302012
Scheduling in-house transport vehicles to feed parts to automotive assembly lines
S Emde, M Gendreau
European Journal of operational research 260 (1), 255-267, 2017
1082017
Balancing mixed-model assembly lines: a computational evaluation of objectives to smoothen workload
S Emde, N Boysen, A Scholl
International Journal of Production Research 48 (11), 3173-3191, 2010
842010
Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets
N Boysen, S Emde
European Journal of Operational Research 239 (3), 820-829, 2014
682014
An integrated model to improve ergonomic and economic performance in order picking by rotating pallets
CH Glock, EH Grosse, H Abedinnia, S Emde
European Journal of Operational Research 273 (2), 516-534, 2019
642019
Sequencing of picking orders in mobile rack warehouses
N Boysen, D Briskorn, S Emde
European Journal of Operational Research 259 (1), 293-307, 2017
572017
Cooperative twin-crane scheduling
D Briskorn, S Emde, N Boysen
Discrete Applied Mathematics 211, 40-57, 2016
562016
Integrated truck and workforce scheduling to accelerate the unloading of trucks
G Tadumadze, N Boysen, S Emde, F Weidinger
European Journal of Operational Research 278 (1), 343-362, 2019
492019
The parallel stack loading problem to minimize blockages
N Boysen, S Emde
European Journal of Operational Research 249 (2), 618-627, 2016
482016
Crowdshipping by employees of distribution centers: Optimization approaches for matching supply and demand
N Boysen, S Emde, S Schwerdfeger
European Journal of Operational Research 296 (2), 539-556, 2022
472022
Just-in-time vehicle routing for in-house part feeding to assembly lines
S Emde, M Schneider
Transportation Science 52 (3), 657-672, 2018
442018
Fast timing with plastic scintillators for in-beam heavy-ion spectroscopy
R Hoischen, S Pietri, D Rudolph, W Prokopowicz, H Schaffner, S Emde, ...
Nuclear Instruments and Methods in Physics Research Section A: Accelerators …, 2011
402011
Logic-based benders decomposition for scheduling a batching machine
S Emde, L Polten, M Gendreau
Computers & Operations Research 113, 104777, 2020
392020
The basic train makeup problem in shunting yards
N Boysen, S Emde, M Fliedner
OR spectrum 38, 207-233, 2016
392016
Scheduling the replenishment of just-in-time supermarkets in assembly plants
S Emde
OR spectrum 39 (1), 321-345, 2017
372017
The system can't perform the operation now. Try again later.
Articles 1–20