Prati
Jingyang Xu
Jingyang Xu
Potvrđena adresa e-pošte na fb.com
Naslov
Citirano
Citirano
Godina
A method for computing optimal set-point schedules for HVAC systems
D Nikovski, J Xu, M Nonaka
Proceedings of the 11th REHVA World Congress CLIMA, 2013
412013
Solving assembly scheduling problems with tree-structure precedence constraints: A Lagrangian relaxation approach
J Xu, R Nagi
IEEE Transactions on Automation Science and Engineering 10 (3), 757-771, 2013
272013
Identical parallel machine scheduling to minimise makespan and total weighted completion time: a column generation approach
J Xu, R Nagi
International Journal of Production Research 51 (23-24), 7091-7104, 2013
142013
Method for Controlling HVAC Systems Using Set-Point Trajectories
DN Nikovski, J Xu
US Patent App. 13/324,140, 2013
132013
Method for operating building climate control system using integrated temperature and humidity models
J Xu, DN Nikovski
US Patent 8,958,921, 2015
122015
Single elevator scheduling problem with complete information: An exact model using mixed integer linear programming
J Xu, T Feng
2016 American Control Conference (ACC), 2894-2899, 2016
102016
Scheduling live interactive narratives with mixed-integer linear programming
S Azad, J Xu, H Yu, B Li
Proceedings of the AAAI Conference on Artificial Intelligence and …, 2017
92017
A humidity integrated building thermal model
J Xu, D Nikovski
2016 American Control Conference (ACC), 1492-1499, 2016
62016
A framework for real-time near-optimal train run-curve computation with dynamic travel time and speed limits
J Xu, D Nikovski, S Kimura
2015 American Control Conference (ACC), 533-540, 2015
32015
Method for determining run-curves for vehicles based on travel time
J Xu, D Nikovski
US Patent 8,838,304, 2014
22014
Transaction Proposal Generator
TW DENSLOW III, LC Kuznia, KS Hill, SW Whittington, H Yu, J Xu
US Patent App. 14/804,949, 2017
12017
Method for determining run-curves for vehicles in real-time subject to dynamic travel time and speed limit constraint
J Xu, D Nikovski
US Patent 8,660,723, 2014
12014
Techniques for estimating person-level viewing behavior
T Denslow, H Yu, DT Parker, J Xu, L Kuznia
US Patent 11,343,587, 2022
2022
Complex scheduling problems in manufacturing and railroad industries
J Xu
State University of New York at Buffalo, 2010
2010
Sustav trenutno ne može provesti ovu radnju. Pokušajte ponovo kasnije.
Članci 1–14