Follow
Božidar Filipović-Grčić
Božidar Filipović-Grčić
Associate professor
Verified email at fer.hr - Homepage
Title
Cited by
Cited by
Year
High-Frequency Model of the Power Transformer Based on Frequency-Response Measurements
D Filipović-Grčić, B Filipović-Grčić, I Uglešić
IEEE transactions on power delivery 30 (1), 34-42, 2015
712015
Modeling of 25 kV electric railway system for power quality studies
A Župan, AT Teklić, B Filipović-Grčić
Eurocon 2013, 844-849, 2013
532013
Modelling of three-phase electric arc furnace for estimation of voltage flicker in power transmission network
AT Teklić, B Filipović-Grčić, I Pavić
Electric Power Systems Research 146, 218-227, 2017
392017
Prepoznavanje kvarova u prijenosnom sustavu upotrebom umjetnih neuronskih mreža
L Teklić, B Filipović-Grčić, I Pavičić
11. savjetovanje HRO CIGRÉ, 2013
31*2013
Frequency response and harmonic distortion testing of inductive voltage transformer used for power quality measurements
D Filipović-Grčić, B Filipović-Grčić, D Krajtner
Procedia engineering 202, 159-167, 2017
252017
Power quality analysis in electric traction system with three-phase induction motors
B Milešević, I Uglešić, B Filipović-Grčić
Electric power systems research 138, 172-179, 2016
252016
Sensitivity analysis of method for harmonic state estimation in the power system
V Bečirović, I Pavić, B Filipović-Grčić
Electric power systems research 154, 515-527, 2018
222018
Monitoring of transient overvoltages on the power transformers and shunt reactors–field experience in the Croatian power transmission system
B Filipović-Grčić, B Franc, I Uglešić, I Pavić, S Keitoue, I Murat, I Ivanković
Procedia engineering 202, 29-42, 2017
222017
Transients caused by switching of 420 kV three-phase variable shunt reactor
A Župan, B Filipović-Grčić, D Filipović-Grčić
Electric power systems research 138, 50-57, 2016
222016
Lightning overvoltage performance of 110 kV air-insulated substation
B Franc, B Filipović-Grčić, V Milardić
Electric Power Systems Research 138, 78-84, 2016
222016
Modeling of polarization in oil-paper insulation using recovery voltage measurements
B Filipović-Grčić, D Filipović-Grčić, I Uglešić
International review of electrical engineering 6, 430-437, 2011
202011
Application of line surge arresters for voltage uprating and compacting of overhead transmission lines
B Filipović-Grčić, I Uglešić, I Pavić
Electric power systems research 140, 830-835, 2016
182016
Modeling of three-phase autotransformer for short-circuit studies
D Filipović-Grčić, B Filipović-Grčić, K Capuder
International Journal of Electrical Power & Energy Systems 56 (http …, 2014
182014
Analysis of transient recovery voltage in 400 kV SF6 circuit breaker due to transmission line faults
B Filipović-Grčić, D Filipović-Grčić, I Uglešić
International Review of Electrical Engineering 6 (5 Part B), 2652-2658, 2011
182011
Analysis of low frequency electromagnetic fields and calculation of induced voltages to an underground pipeline
B Milesevic, B Filipovic-Grcic, T Radosevic
Proceedings of the 2011 3rd International Youth Conference on Energetics …, 2011
182011
Risk factors for expression and progression of limited joint mobility in insulin-dependent childhood diabetes
J Vuković, M Dumić, A Radica, B Filipović-Grčić, V Jovanović
Acta diabetologica 33, 15-18, 1996
171996
Establishment of a new lightning location system in Croatia
I Uglešić, V Milardić, B Franc, B Filipović-Grčić, J Horvat
CIGRE C4 International Colloquium on Lightning and Power Systems, 1-11, 2010
162010
Establishment of a new lightning location system in Croatia
I Uglešić, V Milardić, B Franc, B Filipović-Grčić, J Horvat
CIGRE C4 International Colloquium on Lightning and Power Systems, Kuala …, 2010
162010
Lightning caused overvoltages on power transformers recorded by on-line transient overvoltage monitoring system
S Keitoue, I Murat, B Filipović-Grčić, A Župan, I Damjanović, I Pavić
Journal of Energy: Energija 67 (2), 0-0, 2018
152018
Lightning Critical Flashover Voltage of High Voltage Insulators: Laboratory Measurements and Calculations
D Filipović-Grčić, B Filipović-Grčić, I Uglešić
International Review of Electrical Engineering 7 (2), 4321-4328, 2012
152012
The system can't perform the operation now. Try again later.
Articles 1–20