Follow
Brijesh Paul
Brijesh Paul
Professor
Verified email at mace.ac.in - Homepage
Title
Cited by
Cited by
Year
Rationing mechanisms and inventory control-policy parameters for a divergent supply chain operating with lost sales and costs of review
B Paul, C Rajendran
Computers & Operations Research 38 (8), 1117-1130, 2011
382011
Optimal and heuristic base-stock levels and rationing policy for a divergent supply chain
B Paul, C Rajendran
International Journal of Industrial and Systems Engineering 5 (4), 460-484, 2010
182010
Multi objective optimization for scheduling repetitive projects using GA
J Mathew, B Paul, J Dileeplal, T Mathew
Procedia Technology 25, 1072-1079, 2016
172016
A modified serial scheduling scheme for resource constrained project scheduling weighted earliness tardiness problem
S Rajeev, S Kurian, B Paul
International Journal of Information and Decision Sciences 7 (3), 241-254, 2015
102015
Design and analysis of a smart-attachment to jacket and helmet used by two-wheeler riders using Peltier-module
AST Eldho, JT Paul, K John, J Jose, B Paul
Materials Today: Proceedings 42, 862-869, 2021
82021
Optimization of milling parameters in jute fiber reinforced epoxy composite using GRA
A Rajendran, B Paul, K Shunmugesh
Materials Today: Proceedings 43, 3951-3955, 2021
62021
A hybrid algorithm for uncapacitated facility location problems
TG Pradeepmon, B Paul
International Journal of Services, Economics and Management 3 (2), 197-206, 2011
62011
Optimization of process parameters of machining in coir fiber reinforced epoxy composites
BM Varghese, B Paul, K Shunmugesh
Materials Today: Proceedings 43, 3880-3886, 2021
52021
Inventory management of perishable products with fixed shelf life for a single echelon system
J Noble, K John, B Paul
Materials Today: Proceedings 72, 2863-2868, 2023
42023
An integrated approach for heat transfer analysis of engine fins
KK Risal, SZ Varghese, E Paul, B Paul
Materials Today: Proceedings 58, 46-51, 2022
32022
A mathematical and heuristic approach for scheduling repetitive projects in a Bi-objective single crew model
J Mathew, B Paul
Journal of Scientific & Industrial Research 80 (09), 800-808, 2021
32021
Exact and heuristic algorithms for inventory rationing in a divergent supply chain with order costs
B Paul, C Rajendran
International Journal of Industrial and Systems Engineering 6 (4), 381-416, 2010
32010
A new (q*, S) policy to manage inventory for low shelf life products facing deterioration in quality and age differentiated requirements
J Noble, K John, B Paul
Computers & Industrial Engineering 173, 108706, 2022
22022
Heuristic technique for multi-objective optimisation of engine cylinder fins
SZ Varghese, B Paul, SM Roy, K John
Materials Today: Proceedings 58, 80-85, 2022
22022
Design optimization of annular fins on an air-cooled 100CC Hero Honda engine using genetic algorithm
AJ Jacob, K Vishnu, B Paul
Int. Res. J. Eng. Technol. 7 (7), 5367-5376, 2020
22020
Auction-based algorithm for solving scheduling problem in cross-docking centres
E Paul, B Paul
International Journal of Logistics Systems and Management 37 (2), 225-238, 2020
22020
A crew model using GAIIPDM in repetitive projects
J Mathew, B Paul
Int J Recent Technol Eng 8 (3), 2019
22019
Design of an accuracy control system in ship building industry
E Paul, DE Babu, B Paul
International Journal of Emerging Technology and Advanced Engineering 4 (6), 6, 2014
22014
A simulated annealing-based hybrid algorithm for solving UFL problems
TG Pradeepmon, B Paul
International Journal of Applied Management Science 4 (3), 274-283, 2012
22012
An integrated operations model for supply of relief items under path disruptions
A Scaria, B Paul
OPSEARCH, 1-23, 2023
2023
The system can't perform the operation now. Try again later.
Articles 1–20