Prati
Farnad Nasirzadeh
Farnad Nasirzadeh
Associate Professor
Potvrđena adresa e-pošte na deakin.edu.au
Naslov
Citirano
Citirano
Godina
Dynamic modeling of labor productivity in construction projects
F Nasirzadeh, P Nojedehi
International journal of project management 31 (6), 903-911, 2013
2462013
Dynamic modeling of the quantitative risk allocation in construction projects
F Nasirzadeh, M Khanzadi, M Rezaie
International Journal of Project Management 32 (3), 442-451, 2014
1592014
Integrating system dynamics and fuzzy logic modelling for construction risk management
F Nasirzadeh, A Afshar, M Khanzadi, S Howick
Construction Management and Economics 26 (11), 1197-1212, 2008
1472008
Integrating system dynamics and fuzzy logic modeling to determine concession period in BOT projects
M Khanzadi, F Nasirzadeh, M Alipour
Automation in construction 22, 368-376, 2012
1312012
4D-BIM dynamic time–space conflict detection and quantification system for building construction projects
A Mirzaei, F Nasirzadeh, M Parchami Jalal, Y Zamani
Journal of construction engineering and management 144 (7), 04018056, 2018
742018
Automated progress controlling and monitoring using daily site images and building information modelling
H Mahami, F Nasirzadeh, A Hosseininaveh Ahmadabadian, S Nahavandi
Buildings 9 (3), 70, 2019
652019
A hybrid simulation framework for modelling construction projects using agent-based modelling and system dynamics: an application to model construction workers' safety behavior
F Nasirzadeh, M Khanzadi, M Mir
International Journal of Construction Management 18 (2), 132-143, 2018
642018
System dynamics approach for construction risk analysis
F Nasirzadeh, A AFSHAR, ZM KHAN
International Journal of Civil Engineering 6 (2), 120-131, 2008
622008
Modeling social sustainability in construction projects by integrating system dynamics and fuzzy‐DEMATEL method: a case study of highway project
M Rostamnezhad, F Nasirzadeh, M Khanzadi, MJ Jarban, M Ghayoumian
Engineering, construction and architectural management 27 (7), 1595-1618, 2020
612020
Dynamic risk analysis in construction projects
F Nasirzadeh, A Afshar, M Khanzadi
Canadian Journal of Civil Engineering 35 (8), 820-831, 2008
602008
Fuzzy cognitive map approach to analyze causes of change orders in construction projects
M Khanzadi, F Nasirzadeh, MS Dashti
Journal of Construction Engineering and Management 144 (2), 04017111, 2018
452018
Applications of wireless sensor networks to improve occupational safety and health in underground mines
S Sadeghi, N Soltanmohammadlou, F Nasirzadeh
Journal of safety research 83, 8-25, 2022
442022
A hybrid simulation approach to model and improve construction labor productivity
P Nojedehi, F Nasirzadeh
KSCE Journal of Civil Engineering 21, 1516-1524, 2017
442017
Neural network-based interval forecasting of construction material prices
M Mir, HMD Kabir, F Nasirzadeh, A Khosravi
Journal of Building Engineering 39, 102288, 2021
422021
A hybrid SD–DES simulation approach to model construction projects
S Moradi, F Nasirzadeh, F Golkhoo
Construction innovation 15 (1), 66-83, 2015
422015
Prediction and improvement of labor productivity using hybrid system dynamics and agent-based modeling approach
M Khanzadi, F Nasirzadeh, M Mir, P Nojedehi
Construction Innovation 18 (1), 2-19, 2018
412018
Modelling the social dimension of sustainable development using fuzzy cognitive maps
F Nasirzadeh, M Ghayoumian, M Khanzadi, M Rostamnezhad Cherati
International journal of construction management 20 (3), 223-236, 2020
362020
Imaging network design to improve the automated construction progress monitoring process
H Mahami, F Nasirzadeh, AH Ahmadabadian, F Esmaeili, S Nahavandi
Construction Innovation 19 (3), 386-404, 2019
342019
Quantitative risk allocation in construction projects using cooperative-bargaining game theory
F Nasirzadeh, H Mazandaranizadeh, M Rouhparvar
International Journal of Civil Engineering 14, 161-170, 2016
322016
Modeling quality management in construction projects
F Nasirzadeh, M Khanzadi, A Afshar, S Howick
International journal of civil engineering 11 (1), 14-22, 2013
322013
Sustav trenutno ne može provesti ovu radnju. Pokušajte ponovo kasnije.
Članci 1–20